Beckhoff II/O-Lightbus Manual do Utilizador Página 8

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 9
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 7
Eiserstr. 5, D-33415 Verl, Germany, Phone +495246/963-0, Fax +495246/963-149
7 Optical fibre installation instructions
II/O-Lightbus
5. Check fiber ends
Visual inspection Simple visual inspection of the abraded fiber ends:
If one cable end is presented to a light source, then a clean, plane face
without cracks must be observed at the other end.
6. Assemble connector body
Clamp the Kevlar weave between clamping washer and cutting ring and
insert the cable into the connector body. Follow on with the remaining rings
and secure the connector with the screw fitting.
~31mm
Vista de página 7
1 2 3 4 5 6 7 8 9

Comentários a estes Manuais

Sem comentários